Human Factors Influencing Project Management Success: Development, Content Validation, and Reliability of a Measurement Instrument
DOI:
https://doi.org/10.29105/vtga12.4-1408Keywords:
project management success, human competenciesAbstract
The objective of this research is to develop and validate a measurement instrument that assesses the influence of certain competencies on project management success within the context of private companies in Nuevo León. Project management success measures the extent to which the practices used to deliver the project influences with the accomplshisment of stakeholders expectations (Ika et al., 2022). The unit of analysis comprises professionals affiliated with PMI in Nuevo León. The development of the instrument followed these steps: 1) literature review on the variables, 2) formulation of definitions for the variables, and 3) operationalization of the variables into items. A pilot test was conducted with 25 surveys, which were used to validate the instrument through tests such as: 1) content validity (relevance, clarity), 2) language testing, and 3) reliability testing (Cronbach's alpha, composite reliability). The results indicate that the resulting instrument is valid and reliable, with Cronbach's alpha ranging from .782 to .918 and composite reliability ranging from .832 to .923. Therefore, it can be utilized to measure the influence of independent variables on the dependent variable.
Downloads
References
Ali, W., Khan, A. Z., Noor-ul-Amin, D., & Qureshi, I. M. (2024). The influence of emotional intelligence and team building on project success. International Research Journal of Social Sciences and Humanities, 3(1), 616–641. https://doi.org/10.66594/irjssh.v3i1.138
Baccarini, D. (1999). The logical framework method for defining project success. Project Management Journal, 30(4), 25–32. https://doi.org/10.1177/875697289903000405
Brennan, P. F., & Hays, B. J. (1992). The kappa statistic for establishing interrater reliability in the secondary analysis of qualitative clinical data. Research in Nursing & Health, 15(2), 153–158. https://doi.org/10.1002/nur.4770150210
Canales Cerón, M. (2006). Metodologías de investigación social: Introducción a los oficios. LOM Ediciones.
Cortina, J. M. (1993). What is coefficient alpha? An examination of theory and applications. Journal of Applied Psychology, 78(1), 98–104. https://doi.org/10.1037/0021-9010.78.1.98
Hair, J. F., Jr., Matthews, L. M., Matthews, R. L., & Sarstedt, M. (2017). PLS-SEM or CB-SEM: Updated guidelines on which method to use. International Journal of Multivariate Data Analysis, 1(2), 107–123. https://doi.org/10.1504/IJMDA.2017.087624
Lynn, M. R. (1986). Determination and quantification of content validity. Nursing Research, 35(6), 382–385. https://doi.org/10.1097/00006199-198611000-00017
McClelland, D. C. (1973). Testing for competence rather than for “intelligence.” American Psychologist, 28(1), 1–14. https://doi.org/10.1037/h0034092
Mendoza, J., & Garza, J. (2009). La medición en el proceso de investigación científica: Evaluación de validez de contenido y confiabilidad. Innovaciones de Negocios, 6(1), 17–32. https://doi.org/10.29105/rinn6.11-2
Morán Delgado, G., & Alvarado Cervantes, D. G. (2010). Métodos de investigación. Pearson Educación de México.
Pinto, J. K., & Prescott, J. E. (1988). Variations in critical success factors over the stages in the project life cycle. Journal of Management, 14(1), 5–18. https://doi.org/10.1177/014920638801400102
Pinto, J. K., & Slevin, D. P. (1988). Project success: Definitions and measurement techniques. Project Management Journal, 19(1), 67–72.
Rositas Martínez, J. (2014). Los tamaños de las muestras en encuestas de las ciencias sociales y su repercusión en la generación del conocimiento. Innovaciones de Negocios, 11(22), 235–268. https://doi.org/10.29105/rinn11.22-4
Ruiz Bolívar, C. (2002). Instrumentos de investigación educativa: Procedimientos para su diseño y validación. CIDEG.
Shenhar, A., Levy, O., & Dvir, D. (1997). Mapping the dimensions of project success. Project Management Journal, 28(2), 5–13.
Shenhar, A. J., Dvir, D., Levy, O., & Maltz, A. C. (2001). Project success: A multidimensional strategic concept. Long Range Planning, 34(6), 699–725. https://doi.org/10.1016/S0024-6301(01)00097-8
Van Heerden, A. H., Jelodar, M. B., Chawynski, G., & Ellison, S. (2023). A study of the soft skills possessed and required in the construction sector. Buildings, 13(2), 522. https://doi.org/10.3390/buildings13020522
Wellingtone. (2024). The state of project management report. https://wellingtone.co.uk/wp-content/uploads/2024/02/The-State-of-PM.pdf
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Eduardo R. Jara-Villanueva, Adriana Segovia-Romo

This work is licensed under a Creative Commons Attribution 4.0 International License.
a). Authors keep copyright and give the journal the right of the first publication of the work under a Creative Commons attribution license. This license allows others to share the work as long as original authorship and initial publication in this journal is acknowledged.
b). Authors may make other independent and additional contractual agreements for the non-exclusive distribution of the version of the article published in this journal (e.g., include it in an institutional repository or publish it in a book) as long as they clearly indicate that the work was published for the first time in this journal.
